New construction. Before you sign the acceptance form and get your keys, every deficiency needs to be in writing. Afterwards, it’s much harder.

New doesn’t mean perfect

A new building comes out of a job site where dozens of trades have followed one another. Deficiencies are normal — it’s documenting them that often gets missed. Doors that don’t close properly, missing caulking, drainage sloping the wrong way, a bathroom fan venting into the attic: nothing dramatic on its own, but all of it is far easier to fix before acceptance.

A pre-delivery inspection produces a clear list of deficiencies, with photos and locations, ready to attach to the building acceptance form.

Why timing matters so much

  • Acceptance of the building sets the start date of your legal and contractual warranties.
  • A visible deficiency not reported at acceptance becomes much harder to get fixed.
  • The contractor is still on site: repairs get done quickly.

Garantie de construction résidentielle (Quebec’s new home warranty plan)

If your home is covered by a warranty plan, the list of deficiencies noted at acceptance is a key part of the process. A document prepared by an independent third party carries more weight than a handwritten note at the end of a walkthrough.

The acceptance form is the most important document you’ll sign after the deed of sale. It deserves an inspector.
How it works

Before you sign the acceptance form.

  • 01

    Pick a date

    Ideally a few days before the scheduled acceptance, to leave time for repairs.

  • 02

    The visit

    Room by room, component by component. Every deficiency is photographed and located.

  • 03

    The list

    A clear document, delivered quickly, written to be attached to the acceptance form.

  • 04

    Acceptance

    You sign with the list in hand. On request, a follow-up visit confirms the repairs.